I can offer to Energy market of the
World the innovation power supply. This innovation power supply is based on the
innovation renewable energy. The principle of work of power plant is based on
absolutely new innovation technology for which neither petroleum products, nor
coal, nor gas and any radioactive materials are not required, this power plant
will have no emissions in the atmosphere, will not have any production waste,
that is, does not need any waste recycling neither in the World ocean and nor
on dumps of this or that type. This is a natural renewable energy source which
gives the chance to get this energy 24 hours a day (for example, as in case of
hydroelectric power station) and the whole year - 365 days in a year: from
summer to winter and from autumn to spring, absolutely at one level with the
point of view of the generated electric power, that is, at this power plant
always and constantly will be generated the electricity of the maximum power
for which this power plant is designed, thus, once having started power plant
it is not necessary to think more about any deliveries of any energy carriers
or any fossil fuels for work of this power plant (for example as in case of
wind power plant, the main thing that the wind was blowing). This energy will
be enough for mankind so long as will exist an earth and the nature in such
form in which we know them. On the basis of this energy it is possible to generate
the electric power in any corner of the earth: from Antarctica to the equator
and to the Arctic.
Because the electric power can be
generated always at one level, it is not necessary to use any stores of energy and
accumulators of energy, the energy generated at power plant can be given
directly to the electrical grid of country (for example, as in case of thermal
power station). At the same time it is possible to generate any quantity of the
electric power, power of the power plant, as well as in other cases, depends
only on the physical size of power plant. At construction of power plant it is
necessary to consider the fact that per unit of the generated power of the
electric power a certain volume of power plant is necessary, and this volume
can be distributed between the area of construction of power plant and height
of construction of power plant, that is, the less there will be height of power
plant, the big area will be required and vice versa, the power plant will be
higher, the less area will be required for placement of power plant.
It should be noted that this new and
completely green technology of receiving the electric power is completely based
on already existing scientific and technical knowledge and technologies, in
this technology is used only already existing in the industry and widespread
cheap materials and substances, that is, precious and noble or rare metals and
stones in this technology are not used at all, all technical nodes and
mechanisms on which hardware of new power plant is based, are developed and
mastered by the industry already long ago, that is, it is not necessary to
design some new technical element on some newly discovered physical effect, and
it is not necessary to develop new production technologies of technical devices
of this power plant, receiving the electric power is completely based on the
physical principles already familiar to science and technology, these physical
principles are completely described both mathematically and physically in the
relevant scientific and technical sources, that is, it is not necessary to
conduct any new researches on CERN, it is not necessary to build an ITER,
it is not necessary to invent the warp drive for flights to stars, generally,
no need to do anything else, only to construct power plant, in addition on the
basis of the corresponding calculations will be able precisely to specify all
technical indicators and characteristics of future power plant (because
everything is based already on existing today … all as I told about it above).
For calculation of all technical characteristics
of power plant, for calculation of all constructive details of power plant, for
selection of the materials, for selection already existing in the industry of electrical equipment for this power
plant, for creation of control facilities and a computerization of power plant,
for justification of technical and economic expediency of this or that
execution of power plant, for selection of the equipment for construction of
power plant, undoubtedly is necessary collaboration of the whole design studio,
that is, till the direct beginning of physical construction of this power plant
need a group of engineers, who will take part in standard calculations for design
of power plant and creation of technical documentation on which the new power
plant will be constructed, I would like to repeat that all calculations need to
be made on already known formulas which are known now by engineers of the
corresponding qualification. Such engineers can be found freely in any
industrially developed country which it is capable to build power plants.
I want to add that this very available
and simple technology of generation of the electric power because the
technologies which are the cornerstone of power plant offered by me, were
available by sixtieth years of the twentieth century therefore construction of
such power plants is not difficult and at the same time construction such power
plant will cost more cheap, than construction of nuclear power plants and
hydroelectric power stations.
It will be one of the cheapest types of
the electric power around the world and in spite of the fact that I offer the
cheap electric power, I can suggest to reduce still cost of electricity in cold
season, for example, in the winter, late autumn etc. when consumers will begin
to turn on heating devices which use electricity, that is, consumers will pay,
for example, for the first spent 100 kWh of energy (it approximately, this
indicator it is necessary to tie to the size of living space of the apartment)
the normal price anyway even if the consumer uses more than 100 kWh of energy,
and for all other spent kWh which will appear more than 100 kWh the consumer
will already pay less for every kWh spent, that will give to consumers the
chance be heated on electricity, but not on natural gas, and my innovation
power plant because of specifics of its work, certainly, will be able to give
to the consumer of electricity such chance.
In addition, it will not be necessary to
spend billions of euros for development of new types of energy sources any
more, for example, for developments of the same thermonuclear reactor because
my power plants will be able to give the electric power of any power which will
be able to satisfy any country forever till the end of time.
In light of the above it is possible to
tell that if to introduce power plants of this type which is offered by me,
around the world, then construction of other types of power plants will not be
required any more, and if once to create world infrastructure of power supply
on the basis of power plants offered by me, further service of this
infrastructure can be completely unified when in power supply of the whole
countries any large-scale re-equipment is not required almost whole eternity
any more.
It is possible to note still that all power plants
will be located in the territory of the own country, it will create additional
jobs because power plants will demand maintenance, repair, personnel on duty,
spare parts supply etc. and these jobs will be necessary always because
electricity demand will be always.
In addition, it will not be necessary to look for and
perform any new very expensive international projects for the organization of
energy carriers supply for the own country from other countries, type of the
gas pipeline, oil pipeline etc. because the country will have own power supply
which will generate energy in own territory, and it is possible to tell with
confidence that practically any kind of human activity which demands power
consumption can be transferred to a energy supply by the electric power which
at my stations will be generated in absolutely environmentally friendly way, on
the basis of completely green technology.
All this causes practically the lowest prime cost of
the electricity among all types of generation of the electric power, that is,
electricity rates will be one of the lowest.
I began process of patenting of this power plant, that
is, in this innovation power plant there is a new invention which is a piece of
intellectual property.
I would like to establish the power company.
This power company will be engaged only in
construction of power plants which is offered by me, and generation of the
electric power which it will sell at low price to the companies which will be
engaged in electric power transmission and distribution, that is, an electrical
grid and other electric devices which are necessary for electricity supply to
the end user will not be included into competence of power company which established
by me, so people who work in these companies of electric power transmission and
distribution will remain in the workplaces. In function of this power company
also production of devices and accessories for systems of power supply will not
enter, it will enter functions of the relevant production companies with his
working personnel.
As I see future system of power supply:
For full satisfaction of demand of any country for the
electricity it will be necessary to organize large-scale constructions of many
power plants which is offered by me that will be promoted emergence many jobs.
Also qualified specialists and workers who work at the existing power plants
now can receive jobs in again constructed power plants.
Also there will be a need for devices and materials
for construction of new power plants which will be delivered directly from the
market or is made at the relevant plants of the companies of producers.
If in the future electric vehicles force out cars
which use fossil fuel, then it is possible to convert the existing filling
stations for charging of electric vehicles, for this purpose the existing
filling stations have all infrastructure, roads for calling of cars, ready
buildings, it will only be required to equip these filling stations
corresponding electric equipment, thus, the jobs will be able to keep personnel
of filling stations too. Thus, power plants which are offered by me will be
able to provide completely electric vehicles with the electric power, at the
same time, because generation of the electric power happens without any
greenhouse gas emissions (for example, without emissions of bicarbonate gas
CO2) in the atmosphere of the earth, a complete cycle of operation
of electric vehicles it will be absolutely environmentally friendly because
will be environmentally friendly both the electric vehicle, and generation of
the electric power of which will be charged and powered these electric vehicles.
Power plants which are offered by me can become
completely eco-friendly and highly effective energy source for processing of
industrial wastes, for cleaning of the environment from anthropogenic
pollution.
And it
is possible download the file of blitz presentation:
